Example system design

Example Selectronic off-grid system design

This is an example system design, not a completed customer installation. It explores a Selectronic SP PRO 7.5 kW inverter/charger for stand-alone power. Solar, compatible battery storage, generator size and autonomy remain unconfirmed until the loads and site are assessed.

SAA Accredited Installers
Electrical work by Solar Repair Co (Elec. Lic. 1510704); SAA accredited installers
10-year workmanship warranty, in writing
Battery Backup Specialists
Off-Grid & Hybrid Experience
Selectronic & Victron Capable
Local Grid-Connect & Off-Grid

System specifications

Inverter/charger
Selectronic SP PRO 7.5 kW (Australian-made)
Solar array
Unconfirmed — size and mounting require site assessment
Battery
Unconfirmed — compatible model, voltage and capacity require design
Generator
Unconfirmed — sizing and auto-start compatibility require design
SP PRO continuous model ratings
3 / 3.5 / 4.5 / 5 / 7.5 / 15 / 20 kW
Range surge rating
30-second surge up to 38 kW (SPLC1202, 20 kW continuous); not the rating of this 7.5 kW example

Design goals

  • Assess stand-alone power for a rural property
  • Model winter generation and required autonomy from actual usage
  • Check compatible generator auto-start integration
  • Plan maintenance access and monitoring

Why consider this system

The SP PRO is an inverter/charger option for stand-alone power and generator integration. This example uses the valid 7.5 kW model rating; the final choice requires compatible battery voltage, continuous and starting loads, and current manufacturer documentation.

Backup strategy

A stand-alone design would balance solar, battery reserve and a compatible generator. Generator triggers and charging limits need to be specified for the chosen equipment. No battery runtime, autonomy or generator run-hours have been established for this example.

Design checks

Model winter autonomy

Assess seasonal usage, local solar resource and extended cloudy periods before setting an autonomy target.

Assess solar mounting

Compare roof and ground-mount options using shading, orientation, access, soil and engineering requirements.

Confirm generator integration

Check generator output, start controls, protection and charging limits before specifying integration.

Load considerations

A load schedule must identify continuous demand, motor starts, seasonal loads and deferrable appliances. The 7.5 kW example does not imply that any household's loads have been measured or that its battery capacity has been determined.

Example design scope

This is a preliminary equipment concept, not a completed off-grid installation. Battery capacity, solar size, generator selection and autonomy remain unconfirmed. It reports no customer experience or operational results.

FAQ

Frequently Asked Questions

How much does an off-grid system like this cost?

Permanent off-grid systems sized for a full household typically sit well above grid-connected battery installs — there's significantly more battery, more solar, a generator and far more design work. Request a quote and we'll model your specific property and load profile.

Why Selectronic instead of a cheaper inverter?

For permanent off-grid living, robustness and serviceability matter more than upfront price. Selectronic SP PRO is Australian-designed, built for stand-alone power, and supports decades of use. Cheaper hybrid inverters used off-grid often fail or behave unpredictably when pushed in genuine off-grid duty.

Do you need a generator with an off-grid system?

For year-round permanent residence in SEQ — yes, in almost all cases. The generator covers the worst weather stretches that would otherwise require an oversized (and uneconomic) solar/battery system. For weekenders or part-time use, a generator may not be required.

How much maintenance does an off-grid system need?

Annual service inspection, generator service per the manufacturer's schedule (typically yearly), and remote monitoring throughout the year. Lithium batteries are essentially maintenance-free; the diesel generator needs a few hours of attention per year.

Can you do off-grid installs across the Sunshine Coast Hinterland?

Yes — Maleny, Montville, Mapleton, Witta, Conondale and surrounding hinterland acreage properties. We're equipped for rural sites and the longer logistics that come with them.

Ready for a Battery Install Quote?

Tell us about your home and we'll come back with a clear, itemised quote.