Off-Grid Power for Farms, Acreage & Workshops
Stand-alone power systems engineered around the heavy intermittent loads typical of rural properties — bore pumps, irrigation, welders, workshop tools and main residence loads on a single integrated system.
Rural properties don't run like suburban homes. A bore might draw 8 kW for an hour twice a day, a workshop compressor cycles every few minutes, irrigation pumps need to start in any weather, and the residence still needs 24/7 power. We design rural off-grid systems around the actual load profile — not a glossy brochure — so the system pays for itself and stays out of your way.
Designing for rural load profiles
Rural loads are dominated by motors. Bore pumps, water pressure pumps, sheds with compressors and welders, cool rooms, and centre-pivot irrigation all draw heavy startup current. We size inverter surge capacity to these loads specifically, and use soft-starters or VFDs where they let us run a smaller inverter without compromising performance.
- Bore pump and irrigation pump compatibility
- Workshop loads (welders, compressors, lathes) on dedicated circuits
- Cool rooms, freezers and 3-phase loads accommodated
- Residence and outbuildings on a unified bus where practical
Load management and prioritisation
On rural systems we configure load management — non-essential loads (irrigation, hot water, pool pumps) shed automatically when battery state of charge drops, and re-enable when solar input recovers. Critical loads (residence, refrigeration, communications) stay up. This lets you size the system for normal operation rather than worst-case simultaneous everything.
- Tiered load priority — critical, deferrable, optional
- Auto-shed on low SoC, auto-restore on solar recovery
- Schedulable loads (hot water, pool, irrigation) tied to solar yield
Generator integration on the farm
Rural properties usually have an existing diesel generator. We integrate it as the system backup with two-wire auto-start, so it runs rarely but reliably — for bulk-charging during long overcast stretches, or to support unusual heavy loads (welding all day, harvest pumps). When properly integrated, the generator runs hundreds of hours less per year than it did before solar.
Three-phase rural systems
Many rural properties have three-phase loads — large pumps, workshop machinery, cool rooms. Three-phase off-grid inverter setups (Selectronic, Victron Quattro parallel) can be used where appropriate, with phase balancing managed by the inverter system rather than the homeowner.
Frequently Asked Questions
Can off-grid solar run a bore pump?
Yes, with the inverter sized to the pump's locked-rotor current. We often pair the install with a VFD or soft-starter to reduce inrush and let you use a smaller inverter.
What about three-phase loads on the farm?
Parallel Selectronic or Victron Quattro configurations can support three-phase off-grid loads. We can advise on and compare these options against phase loading, or offer alternatives.
How much battery do I need for a working farm?
Most working farms land between 40 and 100 kWh usable, depending on how much load shifts to daytime vs overnight.
Can I keep my existing diesel generator?
Almost always — we integrate it with two-wire auto-start and use it as the backup. You'll run it far less than you do today.
Will the system handle harvest or peak-season loads?
Yes, if we know about them at design time. Heavy seasonal loads usually mean a slightly larger inverter and a generator run during peak weeks rather than a much larger battery year-round.
Ready for a Battery Install Quote?
Tell us about your home and we'll come back with a clear, itemised quote.