Example system design

Example Sigenergy SigenStor system design

This is an example system design, not a completed customer installation. A Sigenergy SigenStor controller with two 8.0 kWh battery modules provides 15.6 kWh usable storage. Solar compatibility, supply phase and backup scope require a property-specific assessment.

SAA Accredited Installers
Electrical work by Solar Repair Co (Elec. Lic. 1510704); SAA accredited installers
10-year workmanship warranty, in writing
Battery Backup Specialists
Off-Grid & Hybrid Experience
Selectronic & Victron Capable
Local Grid-Connect & Off-Grid

System specifications

Battery
2 × 8.0 kWh modules — 15.6 kWh usable (7.8 kWh usable per module)
Controller example
10 kW single-phase Sigen Energy Controller
Module options
5.0 / 8.0 kWh modules (5.2 / 7.8 kWh usable); 1–6 modules per controller
Controller range
5–12 kW single-phase and 5–30 kW three-phase
Backup output
10 kW nominal / 15 kW peak for 10 seconds for the example controller; final configuration to be confirmed
Backup scope
Subject to load assessment, compatible gateway and switchboard design

Design goals

  • Store surplus solar for use after sunset
  • Assess essential-circuit or whole-home backup against actual loads
  • Check options for future EV charging before specifying equipment
  • Use a compatible integrated controller and battery stack

Why consider this system

This example explores an integrated controller and modular battery stack. Two 8.0 kWh modules provide 15.6 kWh usable storage, not 16 kWh usable. The final controller, gateway and module configuration must be checked against the property and current manufacturer requirements.

Backup strategy

A compatible gateway and suitable circuit arrangement would be required for backup. The design would compare essential-circuit and whole-home options using measured running and starting loads. No uninterrupted supply, transfer-time or runtime outcome is promised by this example.

Design checks

Check solar compatibility

Assess PV string voltage, current, array condition and supply phase before deciding whether an inverter replacement is appropriate.

Plan switchboard and backup wiring

Check available space, protection, isolation and backup circuit arrangements before quoting.

Assess future EV charging

Confirm charger compatibility, available capacity and cable routes before allowing for future expansion.

Load considerations

The example controller rating is 10 kW nominal / 15 kW peak for 10 seconds. Actual running loads, motor starts, battery discharge limits and reserve settings must be assessed together. This example contains no measured household load profile.

Example design scope

This example outlines equipment and design checks only. It has no customer savings, commissioning results or observed outage performance. A site assessment is required for a property-specific quote.

FAQ

Frequently Asked Questions

Is this a completed Buderim installation?

No. This is an example system design, not a completed customer installation.

Can existing solar panels be retained?

Panel condition and string compatibility would need to be checked before specifying an inverter upgrade.

Can this system actually run a whole house in a blackout?

Backup scope depends on running and starting loads, supply phase, controller and battery limits, gateway and circuit design. This example does not establish that any particular home can be fully backed up.

What does this kind of installation cost?

It depends on the battery capacity, whether a hybrid inverter is required, switchboard condition and backup scope. Request a quote and we'll come back with an itemised price for your home.

Is Sigenergy a good choice for Sunshine Coast homes?

It's our preferred hybrid stack for homes that want serious backup capability and a clean upgrade path. The IP65 outdoor rating handles coastal humidity well and the modular battery design is genuinely useful for staged investment.