Example Sigenergy SigenStor system design
This is an example system design, not a completed customer installation. A Sigenergy SigenStor controller with two 8.0 kWh battery modules provides 15.6 kWh usable storage. Solar compatibility, supply phase and backup scope require a property-specific assessment.
System specifications
Design goals
- Store surplus solar for use after sunset
- Assess essential-circuit or whole-home backup against actual loads
- Check options for future EV charging before specifying equipment
- Use a compatible integrated controller and battery stack
Why consider this system
This example explores an integrated controller and modular battery stack. Two 8.0 kWh modules provide 15.6 kWh usable storage, not 16 kWh usable. The final controller, gateway and module configuration must be checked against the property and current manufacturer requirements.
Backup strategy
A compatible gateway and suitable circuit arrangement would be required for backup. The design would compare essential-circuit and whole-home options using measured running and starting loads. No uninterrupted supply, transfer-time or runtime outcome is promised by this example.
Design checks
Check solar compatibility
Assess PV string voltage, current, array condition and supply phase before deciding whether an inverter replacement is appropriate.
Plan switchboard and backup wiring
Check available space, protection, isolation and backup circuit arrangements before quoting.
Assess future EV charging
Confirm charger compatibility, available capacity and cable routes before allowing for future expansion.
Load considerations
The example controller rating is 10 kW nominal / 15 kW peak for 10 seconds. Actual running loads, motor starts, battery discharge limits and reserve settings must be assessed together. This example contains no measured household load profile.
Example design scope
This example outlines equipment and design checks only. It has no customer savings, commissioning results or observed outage performance. A site assessment is required for a property-specific quote.
Frequently Asked Questions
Is this a completed Buderim installation?
No. This is an example system design, not a completed customer installation.
Can existing solar panels be retained?
Panel condition and string compatibility would need to be checked before specifying an inverter upgrade.
Can this system actually run a whole house in a blackout?
Backup scope depends on running and starting loads, supply phase, controller and battery limits, gateway and circuit design. This example does not establish that any particular home can be fully backed up.
What does this kind of installation cost?
It depends on the battery capacity, whether a hybrid inverter is required, switchboard condition and backup scope. Request a quote and we'll come back with an itemised price for your home.
Is Sigenergy a good choice for Sunshine Coast homes?
It's our preferred hybrid stack for homes that want serious backup capability and a clean upgrade path. The IP65 outdoor rating handles coastal humidity well and the modular battery design is genuinely useful for staged investment.
Ready for a Battery Install Quote?