Engineered Battery Retrofits
The actual engineering work behind a retrofit — cable runs, switchboard upgrades, sub-board design and commissioning by accredited installers.
A battery retrofit isn't just mounting a battery. The real work is the engineering: assessing the switchboard, designing the cable path, sizing the protection devices, building the essential-loads sub-board, and commissioning the system to AS/NZS 5139. Most retrofit problems we see in the field come from rushed installs that skipped the engineering.
The retrofit engineering checklist
Before we book a retrofit we walk through a fixed checklist: existing inverter type and compatibility, switchboard condition and capacity, available wall space and ventilation, cable run path, mounting surface, network connectivity for monitoring, and any tariff or metering changes required.
- Inverter compatibility and AC-coupling vs hybrid decision
- Switchboard load assessment and any required upgrades
- Mounting surface, ventilation and IP rating considerations
- Cable routing, conduit and protection device sizing
- Essential-loads sub-board design (backup comes standard on every install)
Switchboard upgrades that often go with retrofits
Older switchboards (pre-2013, ceramic fuses, no main switch, no RCDs) usually need upgrading before a battery is connected. We do this as part of the retrofit, with the new switchboard layout designed around the battery and any backup circuits from day one.
Commissioning and handover
Every retrofit is commissioned to manufacturer spec and AS/NZS 5139, with monitoring set up, backup tested live, and documentation provided on the day. You get the certificate of electrical safety, the commissioning report and a walk-through of the monitoring app.
Frequently Asked Questions
Will my existing switchboard need upgrading for a battery?
Sometimes. Modern switchboards usually accept a battery without modification; older boards (pre-2013, no RCDs, ceramic fuses) typically need an upgrade. We assess this at the site visit.
How long does a battery retrofit take?
Single-day for most retrofits. Add a day for switchboard upgrades or hybrid inverter swaps.
Can you retrofit a battery to a complicated solar system (e.g. SolarEdge with optimisers)?
Yes — we just need to confirm AC-coupling works with the inverter, or move to a DC-coupled hybrid solution. SolarEdge is common and well supported.
Do I get documentation after a retrofit?
Yes — certificate of electrical safety, commissioning report, equipment manuals, and walk-through of monitoring. All required for warranty and any future work.
What standard governs retrofit battery installations?
AS/NZS 5139 (battery installations) and AS/NZS 3000 (wiring rules). Grid-connected battery sign-off requires current SAA battery accreditation.